BrainTrust Investment Lab › Band 3 — Loading (Delivering to the Kimball STAR)
BrainTrust Investment Lab

SS17 — Dimension Manager System

← RETURN

Band 3 — Loading (Delivering to the Kimball STAR) · book 479-480 · grain: one station per walk sheet

Conformed dimensions are published like software: versioned releases, one publisher, every subscriber on the same edition. No two reports disagree because they joined different copies of the truth.

completed
0 of 1
running now
dim_security
completedrunningawaiting its turn · owedfailedexcluded
dim_security↻rank 1 · walking · 8 step(s) certified

The contract — what each step must produce

#steppagewhat the book requires
2one conformed dimension, one sourcep.479'A conformed dimension is by necessity a centrally managed resource: Each conformed dimension must have a single, consistent source.'
3the six, made MECHANICALp.480'Update the version number of the dimension if any type 1 or type 3 changes are made... Replicate the revised dimension simultaneously to all fact…
4the version is in every row -- and drill-across uses itp.480'This version number should be utilized to support any drill-across queries to assure that the same release of the dimension is being utilized.'
5simultaneous, or declared otherwisep.480'the dimension manager must carefully manage the simultaneous release of new versions of the dimension to every fact provider'